UMS and KWS on RTL 4 News
In the RTL 4 news broadcast of 29 September you can see how Urban Mobility Systems enables road construction to work emission-free.
KWS Infra Eindhoven is working on asphalt maintenance on the N280 provincial road on behalf of the Province of Limburg. On the entire route, the asphalt construction is removed in layers and reapplied. The existing emergency lane will also be replaced by a strip with overgrowable grass concrete tiles and the existing guide rail will be replaced.
In the excerpt, Raymond van de Stadt, Director KWS Infra, and Lars Kool, CEO/CTO Urban Mobility Systems, explain how the challenge of making road construction more sustainable is being tackled with the fully electric asphalt spreader built by UMS.